Pages

Non-nuclear B61 bomb complete first developmental flight test

The United States Air Force (USAF) and National Nuclear Security Administration (NNSA) completed the first development flight test of a ...


The United States Air Force (USAF) and National Nuclear Security Administration (NNSA) completed the first development flight test of a non-nuclear B61-12 gravity bomb at Tonopah Test Range in Nevada on July 1, 2015.

This test is the first of three development flight tests for the B61-12 Life Extension Program (LEP), with two additional development flight tests scheduled for later this calendar year. This test demonstrated successful performance in realistic flight environments followed by an effective release of a development test unit from a USAF F-15E from Nellis AFB.

The B61-12 LEP refurbishes both nuclear and non-nuclear components to extend the bomb’s service life while improving its safety, security and reliability.

The flight test asset consisted of hardware designed by Sandia National and Los Alamos National Laboratories, manufactured by the National Security Enterprise Plants, and mated to the USAF tail-kit assembly, designed by Boeing.

 Telemetry, tracking and video data were successfully collected. This test provides confidence in the weapon system and instrumentation system designs and the hardware at its current state prior to going to a baseline design review in 2016.


The B61-12 LEP entered Development Engineering in February 2012 after approval from the Nuclear Weapons Council, a joint Department of Defense and Department of Energy/NNSA organization established to facilitate cooperation and coordination between the two departments as they fulfill their complementary agency responsibilities for U.S. nuclear weapons stockpile management.

 The B61-12 LEP is a joint USAF and NNSA program that preserves a critical element of the U.S. Nuclear Triad and demonstrates continued support for extended deterrence and assurance commitments.

With the incorporation of an Air Force provided tail-kit assembly, the B61-12 will replace the existing B61-3, -4, -7, and -10 bombs.

The B61 nuclear bomb is one of the primary thermonuclear weapons in the U.S. Enduring Stockpile following the end of the Cold War. It is an intermediate yield strategic and tactical nuclear weapon featuring a two-stage radiation implosion design.

The B61 is a variable yield bomb (0.3 to 340 kiloton yield in various versions and settings) designed for carriage by high-speed aircraft. It has a streamlined casing capable of withstanding supersonic flight speeds. The weapon is 11 ft 8 in (3.58 m) long, with a diameter of about 13 in (33 cm). Basic weight is about 700 lb (320 kg), although the weights of individual weapons may vary depending on version and fuze/retardation configuration.