Pages

VH-92A Marine One configured helicopter complete maiden flight

Sikorsky has completed first flight of new Marine One VH-92A configured test aircraft in support of the U.S. Marine Corps’ VH-92A President...

Sikorsky has completed first flight of new Marine One VH-92A configured test aircraft in support of the U.S. Marine Corps’ VH-92A Presidential Helicopter Replacement Program.


The July 28 flight signals the start of the 250 hour flight test program, which will take place at Lockheed Martin facilities in Owego, New York.

Scheduled for entry into service in 2020, the VH-92A Marine One will transport the president and vice president of the United States and other officials.

The aircraft achieved its first flight on Thursday , and later that same day completed a second flight at Sikorsky Aircraft in Stratford, Connecticut. Total flight time for the two sorties was one hour and included hover control checks, low speed flight, and a pass of the airfield.

“This first flight of the VH-92A configured test aircraft is an important milestone for the program,” said Spencer Elani, director VH-92A program at Sikorsky. “Having independently tested the aircraft’s components and subsystems, we are now moving forward to begin full aircraft system qualification via the flight test program.”

As the flight test program proceeds, this test aircraft (Engineering Development Model 1, or EDM-1) will be joined by an additional test aircraft (EDM-2) over the course of the 12-month flight test program. EDM-2 is on track for its first flight later this year.

The VH-92A aircraft is based on Sikorsky’s successful and FAA-certified S-92A commercial aircraft, which recently surpassed one million flight hours. The S-92A aircraft, assembled in Coatesville, Pennsylvania, is being modified to include integration of government-defined missions systems and an executive interior.

The U.S. Navy awarded a $1.24 billion fixed-price incentive Engineering and Manufacturing Development (EMD) contract with production options to Sikorsky on May 7, 2014.

The EMD contract will produce a total of six aircraft:  two test aircraft and four production aircraft. The production options for the remaining 17 aircraft will be finalized in FY19.

The VH-92A will replace the aged fleet of Sikorsky VH-3 helicopters based on the Vietnam-era S-61 helicopter.